web analytics

Description

The risk code matrix is a tool for assessing the risk of an occupational task. The Hierarchy of Controls can be used to reduce the level of risk.


Parameters:

(1) severity of injury

(2) likelihood of occurrence

(3) risk code

 

Risk Code

Risk

1

unacceptable

2

high

3

low

 

 

Severity of Injury

Extremely Likely

Likely

Not Very Likely

Extremely Unlikely

fatal or permanent disability

1

1

2

3

severe injury or illness

1

1

2

3

minor injury or illness

2

2

3

3

no injury or illness

3

3

3

3

 

where:

• In electrical work a shock hazard >= 50V is associated with fatal or permanent disability.

 

Risk Code

Risk

Action

1

unacceptable

Do not perform unless risk can be reduced to level 3.

2

high

Reduce risk to level 3 before attempting.

3

low

Safe to perform. Use PPE and follow safe work practices.

 


To read more or access our algorithms and calculators, please log in or register.